1901
First 5 seat board of Water Commissioners
1902
Built 300,000 gallon concrete storage tank (still used today) Started installing water lines in Sunapee harbor area and from Ledge pond in Georges Mills
1902
Signed contract with manufacturing plant (Globe Wrench) for the purpose of pumping the towns water
1914
Installed year round water on Garnet Street
10/3/1914
Special town meeting to vote on buying the US Hame Operation Plant for the purpose of pumping water to town
1926
Sunapee system added chlorination device at the pumping station
1931
Replaced river road pumping station with new brick building (Still in use today)
1937
Installed first water meter at River Road pumping station
1947
Installed a chlorination system in Georges Mills
1950
Increased the water rents to $ 2.00 (This I’m sure cause some users to be unhappy)
1962
Employed engineers to determine whether the town should construct gravel packed wells in Georges Mills. (Wells were constructed in 1996)
1971
Water & Sewer Department were combined to make one deptartment with a 7 seat Commission
1972
Sunapee system built a 700,000 gallon storage tank next to the 300,000 Concrete tank
1988
Added corrosion control to Georges Mills & Sunapee system
1996
Georges Mills wells went on line.
1998
Sunapee's Slow Sand Filter Plant went on line
1999
First Consumer Confidence report & News Letter